Skip to contentFounding offer: the first 10 companies get 25% off any plan for 3 months — code FOUNDING25

Bid review for electrical contractors

Every scope gap, flagged before you submit.

Upload your drawings, specs, estimate, and sub quotes. Bidprobe runs a senior-estimator review and sends back scope gaps, RFIs, recommended qualifications, and a clear bid / no-bid position — before the deadline.

Start a free reviewSee pricing

Built by an electrician and electrical estimator, for electricians and electrical estimators.

Scope-gap analysis

Every drawing and spec is cross-checked against the estimate. Missing scope, under-carried labour, and coordination gaps are flagged with supporting evidence and a potential-loss range.

RFIs and qualifications

A complete RFI package and recommended bid qualifications, so unresolved items don't become your problem after award.

Defensible numbers

Get potential-loss ranges, a document-completeness score, and a bid / no-bid position confident enough to put your name on.

What comes back

From a sample review of a commercial tender package — every finding carries evidence, a potential-loss range, and the action to take.

RFI-03

Confirm responsibility for utility transformer pad, grounding grid, and secondary conduit shown on E-101 one-line note 4.

Potential loss $24,000–$61,000 · Schedule: affects service energization

Sample output for illustration. Every review also includes recommended bid qualifications, a document-completeness score, and a downloadable PDF report. See the full sample report.

How it works

01

Upload the package

Drawings, specs, estimate, bid form, vendor and sub quotes — as many PDFs as the job has.

02

Bidprobe reviews it

Bidprobe reads the package end to end and checks it against scope, code, and carried labour.

03

Get the review

Findings, RFIs, qualifications, and a downloadable PDF report — delivered in minutes.

Watch a full review run

Ninety seconds, start to finish — a sample tender package goes in, findings with dollar exposure come back.

Your bid data stays yours

Not used to train AI

Your documents are analyzed to produce your review — never used to train models.

Encrypted and private

Encrypted in transit and at rest. Only you can see your projects and reviews.

Delete anytime

Remove a project, or your entire account and its files, whenever you want.

See our Privacy Policy for details.

FAQ

Is my bid data confidential?
Yes. Your documents are encrypted in transit and at rest, only you can see your reviews, and you can delete a project or your account at any time. Our AI providers do not train their models on your data.
What file types can I upload?
PDF drawings, specs, and bid forms, plus Excel/CSV estimates and Word or text documents — up to 40 files per package.
How long does a review take?
Most reviews are ready in 5 to 15 minutes. We email you when it's done, so you can close the tab.
Does it cover US and Canadian codes?
Yes — NEC (US) and CEC (Canada). Bidprobe identifies the jurisdiction and flags the enforced code edition to verify with the AHJ, rather than assuming the latest.
What does a subscription include?
Two plans, same full review on both. Solo is $129/mo (USD) or $179/mo (CAD) for up to 8 projects per month (3 re-reviews per project) — built for shops bidding a handful of jobs. Core is $299/mo (USD) or $419/mo (CAD) for up to 25 projects per month (10 re-reviews per project). Prices plus applicable taxes; re-reviews mean an addendum drop costs you nothing extra. Not ready for a subscription? A single review is $75 USD / $105 CAD one-time, covering one tender with 2 addendum re-runs. Your first review is free, no card required.
Can I cancel anytime?
Yes — cancel from your dashboard and access continues until the end of your paid period. No contracts, no cancellation fees.

More questions? Plain answers about what Bidprobe is and isn't.

Don’t submit another bid blind.

One free review per account — no card required.

Start a free review